The Problem:

Kiewit Construction, a large construction company, had a project management nightmare. Field reports were collected and then dispersed to executives for them to interpret manually. Identifying a project in trouble was near impossible. The goals shifted from making a profit to stopping a loss. A solution that could digest hundreds of pages of data points and bring to light any problems was needed urgently.

Construction Equipment Operator. Caucasian Industrial Worker in His 30s and Heavy Duty Machinery.
CAN 500X500

The Solution:

Contemporary Analysis (CAN) built a solution that pulled from the various data sources and presented a clarified version. The input from executives and project managers allowed a predictive model to estimate profit or loss based on data indicators. The resulting dashboard allows executives to drill down on a project when warranted. At the same time the data was now on demand, rather than at the end of the month.

The Results:

  • Executives are better equipped to handle issues brought to them by project managers.
  • Problems are identified before they cause irreparable damage to the project.
  • Projects can use less experienced staff as they can intercede and train as needed.
  • Projects are able to come in on time and under budget more frequently with less waste, leading to greater profitability.